The project consists of providing labor, equipment, and materials to revitalize pressurants and propellants distributions systems piping and components at the Marshall Space Flight Center in Huntsville, Alabama. The project contains approximately 11,200’ of stainless steel underground piping with pressures ranging from 3250 psi to 10,000 psi. All piping joints will be subjected to 100% x-ray inspection and materials will be fully traceable per ASME codes. The project has an 18-month duration.
CONTACT US
256.350.6568
1810 Sherman St. S.E. Decatur, AL 35601
This email address is being protected from spambots. You need JavaScript enabled to view it. AL #95034