Arnold Engineering Development Center (AEDC) – Arnold Air Force Base
The work consists of installing (72) 3” and 4” control valves and the removal and replacement of 6” and 8” cooling water discharge piping for the K3 Cooler located in the 16S wind tunnel at AEDC.
CONTACT US
256.350.6568
1810 Sherman St. S.E. Decatur, AL 35601
This email address is being protected from spambots. You need JavaScript enabled to view it. AL #95034