projects hdr

Navistar

Navistar

The relocation of their Engine crank line necessitated the installation of a designated 900 GPM Fluid Cooler with associated pumps, filters, and piping. M & D was selected to install this closed loop system that provides cooling media for the plant manufacturing process. The project was completed on a “Fast Track” schedule on time and in the budget.

CONTACT US

256.350.6568

P.O. Box 2629 | 1810 Sherman St. S.E.
Decatur, AL 35601

This email address is being protected from spambots. You need JavaScript enabled to view it.